Skip to content
Nij Web Solutions LLP — Business Operations & Workflow Automation

Use case · Quality Inspection Workflow

An Inspection That Happens Because Production Finished

Production completion → inspection → approval or rejection → rework, with dispatch gated on the result.

The flow

  1. Production reports completion
  2. Inspection created and assigned
  3. Lot held from dispatch
  4. Parameters recorded against the lot
  5. Pass, reject, rework or concession
  6. Dispatch released only on a pass

What changes

The same work, before and after

Not a feature comparison — the same sequence of events, described twice.

How it works today

  • Inspection happens when quality is told, not when production finishes
  • Results live in a register that reporting cannot reach
  • Dispatch works from what it believes is cleared
  • Rejected material sits in stock and is occasionally used
  • Rework is recorded as fresh production

How it works after

  • Completion creates the inspection and assigns it, with the lot automatically held
  • Parameters are recorded against the lot, so results are reportable
  • Only cleared lots can be selected for dispatch — enforced, not remembered
  • Rejected material moves to a blocked state that reporting can see
  • Rework is a distinct route with its own cost

The part people underestimate

The decisions that have to be made before any of this is built

Automation is the easy half. These are the questions that decide whether the workflow survives contact with your operation — and they are your decisions, not ours.
  • 01

    What triggers an inspection

    Every completion, a sample plan, or a rule by customer or grade. Whichever it is, it has to be automatic — an inspection somebody has to remember to create is an inspection that gets skipped under pressure.

  • 02

    Who may release, and who may concede

    Passing a lot and accepting a lot that failed on concession are different decisions requiring different authority. Both must be recorded against a name.

  • 03

    What happens to rejected material

    Rework, scrap, downgrade or return to vendor — each with a route, a cost and a record. Without this, rejected material quietly rejoins available stock.

  • 04

    Whether dispatch can override

    It should not be able to, and if it can, the override must be recorded and reported. This is the control that prevents the most expensive class of mistake.

Management visibility

What this makes visible

Each of these is something that currently requires asking a person.
  • Inspection backlog and its effect on dispatch
  • Rejection and rework rates by process, machine and operator
  • Defect types ranked, so corrective action has a target
  • Lots currently held, and what is waiting behind them
  • Concessions granted, by whom and how often
  • Complete inspection history per lot, for any later question

Questions

Frequently asked questions

Still unsure whether your processes are a fit? Walk us through one of them.

Book an Operations Automation Consultation

Can inspection be recorded on the shop floor?

Yes, and it should be. Parameters entered where the inspection happens, on a tablet, against the lot — because a result written on a sheet and entered later is a result nobody can act on today.

What if we accept material on concession regularly?

Then make it a recorded decision with an authority rather than an informal one. The value is not in preventing concessions; it is in being able to see how many you grant, for which defects, and to which customers.

Does it support customer-specific specifications?

Yes. Inspection parameters and limits can vary by customer, grade or order, so the check performed is the one that particular consignment actually requires.

Next step

Your business has a process. Let's turn it into a system.

From manual workflows and disconnected departments to connected operations, automated processes and real-time visibility.